Commissioning · Plant · Technology
Field reports from mill shutdowns and unmanned crane cells — what left Feidong, and what it did on the floor.
Chile · 18 Aug 2026
ProjectsOur largest South American deployment to date — a 6,000 kg, 7-axis liner handler signed off inside a 36-hour shutdown.
Read more →
Feidong · 20 Aug 2026
TechnologyScan the load, lock the clamp, write the warehouse job — the same control idea on coil, cathode stack and hopper cells.
Read more →
Guixi · 12 Aug 2026
ProjectsThree QD12.5t-4m unmanned loading cranes — 70 cathode stacks an hour, WMS to clamp, 3D scan on every pick.
Read more →
Zhengzhou · 05 Aug 2026
ProjectsUnloading QD20t-15mA6 and annealing QD20t-30mA6 — scan the truck, clamp the coil centre, feed AGV saddles to ±20 mm.
Read more →
Hefei · 30 Jul 2026
CompanyA three-day audit of process traceability and supplier qualification closed clean — the quality system that follows every JXS unit out of Feidong.
Read more →
Ningxiang · 28 Jul 2026
ProjectsSix 3+3t-8.2mA5 cranes on a 14-station pretreatment and e-coat line — timed dips, auto-tilt drain, remote fault log.
Read more →
Las Vegas · 12 Jul 2026
IndustryThe full relining suite on the floor — liner handlers, bolt rams with torque monitoring, and a steady stream of operators from Australia and Africa.
Read more →
R&D · 28 Jun 2026
TechnologyA new path algorithm, rolling into all JXS units from Q3, validated across 14 mine-site trials before it left the lab.
Read more →
Western Australia · 10 Jun 2026
ProjectsCommissioned in May. Production sign-off four hours after shutdown end — a new site record for the operator.
Read more →
Feidong · 22 May 2026
Company4,800 m² of new floor, two CNC centres and a dedicated paint bay — the campus now sits above 20,000 m² under roof.
Read more →
Hefei · 08 May 2026
TechnologyOperators get a running log of break-out torque on every liner bolt — fewer stuck fasteners, fewer surprises at shutdown.
Read more →
Zambia · 19 Apr 2026
ProjectsA low-profile unit rolled under a 36-foot mill during a planned stop — chute swap without a crane in the building.
Read more →
Feidong · 02 Apr 2026
TechnologyNew pick-up geometry for 6 T liners — the last metres inside the shell, with the handler working and the crew off the liner.
Read more →
Hefei · 21 Mar 2026
CompanyEnvironment and occupational health sat in the same visit as quality — the file that follows a JXS unit out of Feidong.
Read more →
Feidong · 12 Mar 2026
IndustryHPU hangers sized for mill-deck vibration, not a workshop floor — so the bolt ram stays under control at reach.
Read more →
Feidong · 04 Mar 2026
CompanyLarge weldments no longer queue on a single machining cell — boom and turret parts for JXS frames run a second centre.
Read more →Contact our sales team for equipment selection guidance, technical specifications and project quotations.
Contact Our Experts